Work out epoxy volume from area times depth, split A/B from the maker's ratio, and stay inside each product's max layer. Includes a sourced product table.

Updated 9 min read6 Epoxy Products
Units

Quick answer

Epoxy volume is the pour's area times its depth. A 1 m² coat 2 mm deep needs 2,000 mL of mixed epoxy before waste. Split that into Part A and Part B using the product's stated volume or weight ratio, and do not pour thicker than the maker's max layer in one go: coating epoxies are often around 6 mm per layer, while deep-pour products allow thicker lifts. The calculator on this page uses those figures from each product's data sheet.

Formula

V_mL = area_cm² × depth_cm | Part A / Part B from the volume (or weight) ratio | layers = ceil(depth ÷ max layer)

Accuracy

Densities and max layer depths come from each maker's published data sheet (checked 24 Oct 2026). Room temperature, humidity and pigment loading change cure behaviour; when in doubt, pour thinner layers and follow the product sheet.
A two-part rubber mold, opened, standing behind the plaster apple that was cast in it.
A two-part rubber mold opened around its plaster cast. For an irregular shape like this, water displacement gives the volume more reliably than a formula.Photo: José-Manuel Benito Álvarez, Wikimedia Commons, CC BY-SA 2.5. Credits

Reference table

Search by name or sort by any column. Each row links to the matching calculator.

6 of 6 rows · sorted by product

Epoxy products with mix ratio, density and max layer depth from maker data sheets
Calculator
ArtResinCoating / topcoat1:11.053.175 mm (0.13 in)Epoxy calculator
EcoPoxy FlowCastDeep pour / river2:11.0738 mm (1.5 in)Epoxy calculator
EcoPoxy UVPoxyCoating / topcoat1:11.073.2 mm (0.13 in)Epoxy calculator
MAS Deep Pour XDeep pour / river2:11.0676.2 mm (3 in)Epoxy calculator
TotalBoat TableTopCoating / topcoat1:11.056.35 mm (0.25 in)Epoxy calculator
TotalBoat ThickSetDeep pour / river1:11.0912.7 mm (0.5 in)Epoxy calculator

How it works

  1. Volume from area and depth (coating, river and coasters)

    Mixed epoxy volume in millilitres equals the pour area in square centimetres times the depth in centimetres (1 mL = 1 cm³). For a rectangular coat, area is length × width. For a river table, use the void area you measured (or approximate the river as a long rectangle and add a little). Coasters are the same formula on a small footprint; the calculator's coasters mode repeats it for a batch. Always add a waste allowance for mixing cups, brushes and the last bit that will not pour out cleanly.

  2. Mix ratio by volume versus by weight

    Most epoxy kits state a volume ratio (for example 1:1 or 2:1) and a density for the mixed liquid. Weighing parts is more accurate when the two sides have different densities: convert the volume split using each part's density, or use the maker's stated weight ratio when they publish one. The product table on this page shows both the volume ratio and the mixed density we took from each data sheet. Do not mix brands or substitute hardener from another kit.

  3. Max layer depth, heat and multi-pour builds

    Deep single pours can overheat as the resin cures. Each product lists a maximum layer thickness; coating epoxies are typically a few millimetres per coat, while deep-pour formulas allow thicker lifts for river voids. If your target depth exceeds the max layer, pour in stages and follow the maker's recoat window (often a few hours without sanding, longer if you miss it). The calculator counts how many layers you need from the product's max layer figure.

Work it out

Change the inputs to work out your own numbers. Each step of the working is shown with the answer.

Your measurements

Epoxy

1.05 g/cm³

A 1:1 coating epoxy for bar tops, tables and shallow castings, up to 1/4" per coat. Pour coats thicker than 1/4" as 1/4" layers at least 3 hours apart; no sanding needed between coats.

Surface

Shape

Coat

A flood coat is usually 1/8" (3 mm). Thicker coats go on in layers.

Common

10% covers the cup, stirrer and drips. Use 15–20% for live edges, bark and open grain that soak up epoxy.

Total to mix2.6 L

Results

Total epoxy to mix

2.6L

= 2.74 qt

Mixed volume with 10% extra for the cup and drips. Mix 1:1 by volume, 1.2:1 by weight.

Part A (resin)
1.3L
= 1.37 qt
or 1.49 kg by weight
Part B (hardener)
1.3L
= 1.37 qt
or 1.24 kg by weight
Batch weight
2.73kg
= 6.01 lb
At 1.05 g/cm³
Pours
1pour
Up to 1/4" · 6.4 mm at once

Troubleshooting

What usually goes wrong, how to check for it, and how to prevent it.

  • The pour runs short before the surface is covered

    Cause
    Area or depth was underestimated, or waste was left at zero
    How to check
    Mixed volume used is well below area × depth
    Prevention
    Measure the void at several points, use the larger depth, and allow 10% or more for cups and brushes
  • The pour gets hot, yellow or cracks while curing

    Cause
    A single layer thicker than the product's max depth, or a large mass in a warm room
    How to check
    Layer depth above the data-sheet maximum, or a spike in surface temperature
    Prevention
    Split the pour into layers within the max depth, mix smaller batches and cool the room if the sheet says to
  • Soft or sticky patches after the stated cure time

    Cause
    Off-ratio mix, poorly scraped cups, or cold temperatures
    How to check
    Uncured spots where cups were poured out last, or room below the sheet's minimum
    Prevention
    Weigh or measure both parts carefully, scrape sides and bottom while mixing, and warm the room to the maker's range

Common questions

How much epoxy resin do I need for a table top?

Multiply the top's area by the coating depth. A 2 m × 0.8 m top coated 2 mm deep needs 3,200 mL of mixed epoxy before waste. Add your waste allowance, then split Part A and Part B from the product ratio.

How do I calculate epoxy for a river table?

Estimate the river void's area and average depth (or break it into simple shapes), convert to millilitres, add waste, and check the deep-pour product's max layer depth so you know how many lifts to plan. The river-table mode of the calculator does this from length, width and depth.

Should I mix epoxy by volume or by weight?

Follow the data sheet. If it gives a volume ratio, measuring cups are fine for small batches; weighing is more repeatable, especially when Part A and Part B have different densities. Use the maker's weight ratio when they publish one.

Can I pour a river in one go?

Only if the depth stays inside that product's maximum layer. Coating epoxies are not deep-pour products. If the void is deeper than the max layer, pour in stages and respect the recoat window on the sheet.

Calculators for this